Showing posts with label crochet. Show all posts
Showing posts with label crochet. Show all posts

Thursday, January 6, 2011

12in11. Day 129.

A Challenge!

Yesterday, sifting through the Ravelry.com forums, I came across a group titled 12in11. Participants of the group are to select twelve projects to complete in 2011. Of course these are all yarn projects, be it knitting, crochet, spinning, dying, etc.

So my readers, I thought I'd pose the same challenge to you! Why not make 2011 a little more creative, and inspiring than last year? 12 projects isn't that hard, it could be 12 different complicated dinners to make, on per month. 12 5k marathons to run. 12 food festivals to go to.

For my 12 projects, on Ravelry.com I have selected a number of items I have already ordered yarn for, or have started, frogged, and haven't finished. Because I have so many projects on my plate, I didn't want to go, well, overboard. I have a tendency for doing this ... I doubt anyone has noticed.

Here is my ravelry.com, knitting & crochet, 12in11 list, not necessarily in order:

1. Selbu Modern


2. Amigurumi Penguin


3. Annie Hat


4. Subway Hat


5. Feather Dress



6. Museum Tunic


7. Lace and Broomstick Hat


8. Netted Clutch


9. Noro Striped Scarf


10. Fuzzy Mitten Lamb



11. Lace Panel Tunic


And, I am sneaking this one in here, for January. Like I said, I am not trying to go overboard, and this one is legitimate even though it is my pattern, and I finished it yesterday.
12. Diamond Slouchy Beret


What is your 12in11 list?

Tuesday, November 30, 2010

One Yard Wonder in a Week of Project Disapointment. Day 93.

With the whirlwind that was Thanksgiving, I didn't get much work on my projects done. Ok. Well, that's a lie. I just told you a lie. I got a lot done, but I don't feel like I accomplished a whole lot.

I completed kitting two hats, one of which turned out perfectly, so perfectly, in-fact that Ramon wouldn't take it off after I finished it, even though I didn't make it for him. I made this one from my altered pattern from the Knits Men Want book. I still think my pattern alteration could use some further adjustment, so I'll change more in the next one, then I will have changed so much I may have to call it my own pattern. There's a thought.



The second hat turned out too small. The hat is a pattern created for Hermione's knit hat in Harry Potter 6, I think it is. It is a cute hat, and a great pattern. I was making it as a gag gift, but my sister loves it so much, I think that I am either going to make it longer, or make a new one for her. Maybe the "child-size" one can be the gag-gift ... we'll see. Regardless, I still felt pretty disappointed when I realized I hadn't followed the instructions properly. For an adult it needed one more section and cable. The instructions say this, but I guess in the Thanksgiving on the grill coma, I neglected to read the instructions properly.





I also finished the crochet parts of my Monkey, and now I just have to put him all together. I LOVE the fez. Big Kitty does not. Too bad for Big Kitty.



Oh, and as you may have just observed, I finished the Lexington Sweater, almost two weeks ago now, and I love it. I find it to be more itchy than I was hoping, however at the Black Friday yarn sale at my local yarn shop (Hooray for 20% off of my entire purchase), I learned from a fellow knitter about Eucalan soap, which is supposed to soften the fibers, but not change the shape of the finished garment. I really want a Hermione Hat, myself, and since I have extra Berroco Ultra Alpaca in light grey from this sweater, maybe I will make one out of that, and try the soap on it before, hopefully not, ruining my entire sweater.





Yesterday was just a bad day. It started off with buying plane tickets out to see my sister in Georgia in January, only to realize that I had bought a red-eye flight, instead of the daytime flight. It was the only direct flight, and I feel really, really stupid. That is my second, maybe first, biggest blonde moment of the year, either right before, or right after showing up to my Bernina sewing class without my Bernina. I am still hiding in shame from that one, too. So, I looked into changing the flight, and it will cost $150. That is a $150 stupidity tax ... just so you know. Alas, I will just take the damn red-eye. Ugh.

The rest if the day didn't go much better, with the exception of taking advantage of some Cyber Monday deals. Ever since the cats decided to use my black boots for bladder relief after the door to the closet that their litter box resides in was accidentally closed all the way, for 24 hours, I have been in the market for some new boots. Imagine that. With Endless.com's freaking fantastic deals yesterday I go these two:

Kenneth Cole Reatcion Brown Boot. Basic, clean, wearable. Nothing special, but great for every day, jeans, leggins, etc.


A clear tribute to the Louboutin Emily from a few years back. I fell in love with this shoe when it came out, but at the time didn't have the $1000 for it. So, I now settle for the tribute, with will be fun to wear. I have loved these shoes ever since I saw a similar pair on Chloe Sevigny on the cover of Elle UK a few years back (image below). Just beautiful, and beautiful styling.

The shoes I bought:


The original Louboutin Emily:



Ok ok, back to yesterday. Well, Last week I turned in my dress shirt for my pattern making class. Happy that I chose a fabric that is very hard to see mistakes in, I received an A- on it. Not bad. I also finished the muslin of the Bias skirt that we have to turn in tomorrow, as I thought I had to turn it in last week. Well, the construction of the muslin bias skirt is a bit, well, questionable. However, I figure, you win some, you loose some. Then, I discovered that the skirt actually fits me, and if it were well constructed, it would look really nice, so I decided to make one. After my mom and I made a trip to a nearby fabric store during their black Friday weekend sale, I acquired some great, but inexpensive fabric for some upcoming projects. After making friends at the cutting counter, I even scored an extra yard and a half of the fabric for free. I met an awesome fellow with a passion for fashion, and who started tailoring classes as a Sophomore in high school. I told him all about my project, and what I as buying the fabric for. Apparently he thought I was awesome, too, as I didn't realize until I was looking at the receipt last night, and I wasn't charged for the last yard and half on the bolt.

Sewing the skirt went sort of well, the cutting of the pattern not so much. After not having cut myself with an exacto knife since I, literally, cut half way through my finger 6 years ago, I cut myself twice last night. Then I burned my finger with the iron. Then the waistband just wasn't work, so I ripped the whole damned thing out. Ramon advised me, at this point, to stop for the night. But, seeing as how I was now bleeding and burned, I persisted. I tried a lighter weight interfacing in the waistband, and and used it in the whole waistband, instead of just half. Success. From the freebee yard, plus just a little extra for the front panel, and then, needing to make the second waistband I have created this skirt, which Ramon has declared his favorite, stating, "It kind of looks like a flower at the bottom." Ramon, you're cute. I love you.

As this is the second one-yard wonder of the McQueen project, I have decided to honor them with a new category, viewable on the Wordpress version of my blog. The first one-yard-wonder, of course, was the sequin dress.



Today's disaster? Well, my beaufiul McQueen Blue Sweater Dress is almost done. I have been struggling with how to do the collar for weeks. I even knit about 7 different collars, none of them working right, until the one that I made last night. And then, this morning, I stitched it into the completed body of the sweater and what happens? The stitching doesn't stretch like the rest of the knit, making the head/neck hole to small.

So, this means that I need to rip out the entire neck, and the shoulders and well, you know. Ugh, I don't have the heart to do it today. I cannot expressed just how bummed I am about this though.







So, I guess it is, literally, back to the drawing board today. I need to get some drafting done on my final project for school, and I am way, way behind on everything else McQueen. Hello Holidays!

Thursday, October 28, 2010

I don't care what they say, knitting is easier than crochet. Day 60.

So, I have decided to become a baseball fan. No, not a fair weather fan, but an all weather fan. Of course, yes, I am deciding this now that my local team is in the World Series. I actually put a lot of thought into this. Over the summer some of Ramon's friends gave him tickets to a game, as they are season ticket holders and couldn't make it to that game. Well, I had the best time every. Other than our cross-country road-trip it was the summer highlight. Riding on the feeling, I did consider that I might want to become a fan of a team with colors that suited me better than orange and black, but because I had such a fun time at that game at AT&T park I decided to stick with the Giants.

So, last night I watched the game, and worked on my crochet monkey. I finished the body, the cape, and the fez.


Tonight I re-did, and completed Ramon's Halloween hat, with the exception of the red ball that goes on top.


So, half a monkey and a bit-sized jacket and fez versus a whole hat. I am so tired of everyone saying that crochet is so much easier than knitting. I can get through an entire sweater in a week and a half, but a weee monkey?

Ok, ok. I remember how it was when i first started knitting. It took me a month to get through a scarf. Sometimes it is hard to remember and to respect the learning curve. I can see that crochet *will* be easier. In-fact, I even crochet closed Ramon's Halloween hat instead of knitting it, because the hole was so small, and you don't drop stitches in crochet like you do in knitting. So, patience my little monkey. I need to remember that it will take time to feel the same way about my ability to crochet as my ability to knit.

Luckily, with Ramon's hat (almost) done, I am one step closer to Halloween costume success. With our Halloween party only two days away, and with my all day Bernina class on Saturday, I have some really serious Halloween costume finishing to get done tomorrow. OMG! I know I can get it all done but ... I want to get the houndstooth skirt done tomorrow, and the hallway pictures done, too! I am also trying to get my blue McQueen Sweater Dress done before we head off to Kentucky for the Breeder's Cup next week. I think that Thunder, the grey kitten, I am pretty sure will love the ball that will go on Ramon's hat. I wonder, with her joy for playing fetch, will Ramon's hat stay intact long enough to celebrate the main event?

Tuesday, October 26, 2010

Your Mother Isn't Always Right. Day 58.

A number of months back a fellow that I knew tried to explain that the day that you took an action that you knew your mother would want you to do, but you did it for you, not her, was the day that you became an adult. Really, only then? And how come your mother was never "right" before? Well, I have been listening to my mom for years, decades even, and for one simple reason. Why learn from your own mistakes, when you can just do the right thing, instead? Mom is always right. We all know this. This truth has never been proven wrong, and will never foreseeably be wrong, so what happened? How could I so daringly and blatantly state that your mom isn't always right????

One word:

Sequins.

"As soon as you cut it, put it through the serger. Depending on how the sequins are sewing the the fabric, they may just come flying off."

Well, the only things that went flying off were the two tips of my serger needles upon plunging twice into my beautiful sequin fabric.



I guess I should back-up some. First off, I finished my Halloween costume in one day, as promised. In-fact, it only took half a day, but I still have the head-piece and shoes to go, so in the end it will equal one day. Started and finished that on Sunday. Then, I decided that since I have my fancy-new block pattern that I should get the sequins off my wall, and onto, well, me! This piece is so simple, yet so complicated. I had to distill the block down into a one-piece front bodice and skirt with no darts, and a super low cowl neck back/skirt piece, and sleeves. That is a lot of moving around of critical shaping elements. A few yards of muslin later, I felt pretty satisfied, but it wasn't until the trip to the grocery store to pick-up ice-cream for my mom that I had a construction epiphany. I finished the pattern and lining last night, leaving the sequins for today. A good day. My mom was here, of-course, until I started sewing.

The cutting went well, I extended the seam-allowances from my pattern 1/8" for additional room while serging. Well, I serged, and that ended quickly. I started thinking that I was really regretting getting the sequins.

Before she left, I gave my mom a tour of the new Bernina. "Wow, this is a real, adult sewing machine. I have been sewing forever, but I have never had an adult sewing machine." Upon experiencing needle-bits from my serger flying around the room—I think I need protective eye-wear—she encouraged me to try sewing it on my trusted and true Bernina. Starting slowly, hand turning the needle for the first few inches, I found that her advice the second time around was spot on. Maybe I just needed to listen for the construction alternative instead of just accepting the first route. See, she was right!

Beautifully maneuvered over and threw sequins, my solid Bernina got the job done, and just at the moment I was ready to give-up on the entire project, especially as it isn't even a McQueen project, even though it is a McQueen Bumster tribute. Fancier that I was originally imagining, I need to find somewhere fabulous to wear this dress. All done but the hem. Oh, how I love the finishing. Next time I get the d200 and tripod set-up to take hallway pictures, I'll take some of this dress on me, too, as it looks better on then on my lumpy, crappy, old dress-form.





Now, my sewing room looks like an ice-skating competition exploded in it. All that aside, I never thought I'd learn so much through sewing sequins, but with the pattern being a delightful, and welcome challenge, and the fabric itself pushing me into new spaces, I had a great time with this quick project, but I think it may be time to give the Roomba a new, dedicated home.




Last week, while I was being bad, busy, and not updating, I finished the back-side of my sweater dress, and I am now almost half way through the front side, just getting to the waist shaping.



Additionally I am making tremendous progress on my first ever crochet project (or as Ramon calls it a "crotch-ette" project), which is appropriately a monkey, for so many reasons.



I made my cheapest ever trip to JoAnns today—yes, even cheaper than getting one invisible zipper—I bought felt, for the face, and googlie-eyes. My mom forced me to get them, sighting that they are far better, and easier to use than making them out of felt or what-have-you, though also indicating that she *still* has the same jar of them laying around from my sister and my Brownie days in Girl Scouts.

Though, as I know she is right, she always is, I got the googlie-eyes, and I know they won't let me down. Perhaps they'll help me keep my eyes, and ears open for the right answer the next time around.

Now I just need to find new serger needles. Mom, care to chime in?

Thursday, October 14, 2010

It shouldn't be called "Finishing." Day 46.

At the end of each project for which a pattern already exists, there is a small blurb about the "finishing" of the garment. Be it knitting, sewing, crochet, anyone who has worked on one of these sorts of projects knows. "Make button holes and sew on buttons." "Sew arms together and sew to body." "Block to size." etc. Standard with the 80/20 principle, the last 20 percent, or even last 10 percent take 80 percent of the time.

After cleaning up cat yarn-ball emergency #854, I spent, literally, all day completing the "finishing" of the Sweater I Hope Ramon Will Wear. Finally at 6:30 I completed it. I'd like to vote to make a move to change definition of "finishing" to "making." Something that takes 8 hours, when the entire sweater took 40 to make should be included as construction, not "finishing" where you get the false feeling that your juuuuuuuuust about done.

The finishing should be: "Put on. Wear. Feel Fabulous."

That being said, I found this pattern a bit frustrating, with a few small errors which lead to lard corrections. The ribbing of the neck? There is no way that this instruction can be followed as designated in the size 40 chest, smallest gauge pattern. I also found that the math in the sleeve increase was wrong, and the saddle for the left hand sleeve is also specified incorrectly. The right one is fine, so if it is simply switched/mirrored, it all works out fine. All in all I am happy with it, but I am not sold on the colors that I chose. I tried to play it safe, like the book says, but I think that two blues or two greens, or even the gray and charcoal that I thought I'd picked might have been better. I think he is really going to like the overall styling though. It is strong and masculine while still refined, just like my Ramon!

I also learned how to crochet today!

Big plans for the the weekend ... a lot of pattern drafting, and a lot of sewing! I can't wait.

Ramon's sweater, appropriatly hung on an AlpineStars hanger, left over from my photoshoots last January.


My first little crochet piece!


And the yarn emergency. Please note how both cats are actively involved in the emergency.